Is there a specific schedule for the replacement of meters?

There are approximately 8,500 metered connections within Santa Paula. Out of those, approximately 1,000 have been installed or replaced within the last 2 years. The goal is to replace 500-600 /year to maintain the goal of a system-wide replacement every 10-15 years.

Show All Answers

1. What is the Meter Replacement Program?
2. Is there a specific schedule for the replacement of meters?
3. Why has my neighbor's meter been replaced but not mine?
4. How long might it take before my current meter is replaced with a smart meter?
5. Is there a waiting list or can I request to have a smart meter installed?
6. How does the city determine which locations will have their meters replaced each year?